Production System Transformation in 5 Months
Redesign of the production system, including layout redesign and reorganization of workflow and workload. We implemented a standardized methodology by workstation, documented in a manual that facilitates training and maintains a uniform way of working. Five months later, the plant produces 50% more with the same workforce.
Venluz
PVC
Cuenca, Spain
5 months

Starting point
A factory that needed to grow before moving to a new facility
The client came to DCM with a clear objective: to increase their production capacity. To make this possible, they had planned to build a new facility to provide more space and handle a higher manufacturing volume. Before defining the future plant, it was necessary to analyze the specific characteristics of their manufacturing, how the factory was actually working, and what problems might be transferred to the new space if not corrected beforehand.
What was actually slowing down production:
Disorganization of the workspace
Materials, tools, and production elements were accumulating in various areas without a clearly defined location. This forced operators to leave their stations to search for tools or materials, generating unnecessary internal movement and wasted time.
Space constrained by construction work
The partial renovation of the existing facility had left several areas temporarily unusable, concentrating materials and products in a confined space.
Undefined workloads
Manufacturing operated in a more artisanal than sequenced manner. Tasks were not clearly assigned by workstation, and operators moved around to assist in other operations.
Excessive window handling
Windows were turned, moved, leaned, loaded, and unloaded at various points in the process, accumulating unnecessary movements and handling.

"I'm tired of them doing whatever they want; I want this to start looking like a factory."
Manager of VENLUZ
DCM's approach
Four phases to understand the plant before changing anything
An IDP project is not limited to isolated changes. We analyze the factory as a whole, redesign the production system, and provide support during the implementation of the solution.
One week of data collection on-site, measuring the production area, times, and manufacturing specifics, as well as the actual production capacities of the machines.
Six weeks for the preparation of different proposals based on the data collected in the factory study; the proposals are presented and evaluated with the client to define which one is most suitable.
One week of project installation, during which the various pieces of equipment are assembled and the production line startup is fine-tuned to begin manufacturing.
One week of support, during which operators are trained in the new work methodology, and it is validated and confirmed that the planned production is achieved.
Solution and results
A new production system implemented without affecting the factory's daily operations
The startup of the new production system was organized into four phases. Production never stopped, and no committed orders were delayed.
Implementation milestones
Phase 1
Installation
Assembly and integration of new equipment into the production line.
Phase 2
Support
Training operators in the new work methodology.
Phase 3
Validation
Verification that the planned production is achieved.
Phase 4
Operational autonomy
Proactive and continuous monitoring ensuring that the intended result is reached.
In figures
50%
Production increase
34%
Less time per window
Inside the project




More success stories
How we drive other projects
Let's talk about your factory
Do you want to transform your production system's performance?
Tell us how your plant operates today. We will analyze the information to determine if there is room for improvement and will contact you to discuss your factory's needs in depth.