Comprehensive design of a factory from scratch in 4 months
Creation of a production line from scratch, including the layout, workstations, workflows, and factory methodology.
Avindow
PVC
Toledo, Spain
4 months

Starting point
A new factory designed from a blank slate
The client approached DCM with the goal of creating a completely new window factory. Since there was no previous plant, the project did not start from the transformation of an existing production system, but from the opportunity to define how the future factory should operate from the beginning. The starting point was an empty space and a production forecast that had to be turned into a real system, scaled and prepared to operate in an orderly fashion from day one. To achieve this, it was necessary to study the specific details of their manufacturing process and make all production decisions before distributing equipment and organizing the plant.
What needed to be defined from the start
Production system design
It was necessary to establish how each window should move through the process, defining the different manufacturing stages and the relationship between workstations.
New plant layout
The space had to be organized based on the production flow, positioning equipment, work zones, and intermediate areas to avoid unnecessary movement and handling.
Scaling of stations and resources
Each station had to be designed according to the projected production, balancing workloads and determining the necessary resources for each phase.
Work methodology
The new factory needed to start with a sequenced and standardized way of working, with the tasks for each position clearly defined to facilitate staff training and maintain stable operations.

"What concerns me most is having a factory that produces with guarantees"
Production Manager at Avindow
DCM's approach
Four phases to understand the project's evolution
An IDP project is not limited to isolated changes. We analyze the factory as a whole, redesign the production system, and provide support during the implementation of the solution.
One week of data collection and gathering, measuring the production area, and confirming the dimensions of the industrial warehouse.
Five weeks for the development of different proposals based on the data collected for the study; the proposals are presented and evaluated with the client to define which one is the most suitable.
One week for project installation, during which the various pieces of equipment are assembled and the production line startup is fine-tuned to begin manufacturing.
One week of support, during which operators are trained in the new work methodology, and it is validated and confirmed that the projected production is achieved.
Solution and results
A new factory designed to produce in an orderly fashion from day one.
The startup of the new factory was organized into four phases. From the first day, the factory started production, increasing progressively until the target was reached.
Startup milestones
Phase 1
Installation
Assembly and integration of new equipment.
Phase 2
Support
Training operators in the new work methodology.
Phase 3
Validation
Verification that the projected production is achieved.
Phase 4
Operational autonomy
Proactive and continuous monitoring to ensure the intended result is reached.
In figures
11%
more production relative to projected capacity
5
Weeks to reach production target
Inside the project




More success stories
How we drive other projects
Let's talk about your factory
Do you want to transform your production system's performance?
Tell us how your plant operates today. We will analyze the information to determine if there is room for improvement and will contact you to discuss your factory's needs in depth.